​The Mossmorran BESS is a 300MW strategic development featuring a dual-phased shared connection (comprising 200MW and 100MW units). The project has successfully secured full planning consent and will have direct interconnection with the adjacent substation, securing maximum operational efficiency.
​

Site Optimization & Land Use
Situated on 13.9 hectares near Auchtertool, the development is designed with a focused infrastructure footprint. By utilizing only a portion of the total acreage for technical assets, the project maintains significant open space for environmental management and advanced landscaping.

​

Climate Alignment & Grid Resilience
In direct support of Fife Council’s 2045 Net Zero mandate and the 2019 Climate Emergency declaration, this facility serves as a critical stabilizer for the national grid. The project will secure the power supply for thousands of households while facilitating the regional transition to low-carbon energy infrastructure.

​

Environmental Integration & Biodiversity
A comprehensive ecological strategy has been integrated into the site design to ensure the development remains sympathetic to its surroundings. Key environmental highlights include:

  • Visual Mitigation: Extensive landscape screening to minimize the facility's profile.

  • Biodiversity Enhancements: Dedicated measures to improve local habitats and deliver a positive environmental legacy across the site.​​
​​
www.mossmorranbess.co.uk
Indicative site layout
Screenshot 2026-05-07 175952.jpg

2026 by Energy Hub Developments Ltd. 

Registered Address: Intergen House, 65-67 Western Road, Hove, East Sussex, United Kingdom  BN3 2JQ 

Company Number: 13028274

bottom of page