top of page
The Ocker Hill BESS is a 240MW strategic development situated within a primary industrial and urban corridor. This facility is designed to provide high-capacity energy storage, facilitating the capture of renewable generation and its efficient distribution across both local and national networks.
Strategic Decarbonization & Grid Resilience
The project serves as a cornerstone for regional energy transition, directly supporting the Net Zero targets of the local authority and the wider region. By providing a scalable storage solution, Ocker Hill reduces systemic reliance on non-renewable energy sources and enhances the operational resilience of local businesses and communities.
 
Environmental & Urban Integration
The development has been meticulously engineered for compatibility with its urban-industrial setting. Extensive technical assessments confirm that the project will yield no significant adverse impacts regarding:
  • Acoustic & Visual Amenity: Optimized site layout to ensure compatibility with the surrounding landscape.
  • Biodiversity & Heritage: Preserving local ecological and historical value through sensitive design.
  • Infrastructure: Ensuring no unacceptable pressure on highway networks or local utilities.
Market Position
As a critical mid-merit asset, Ocker Hill is positioned to provide essential balancing services to the grid, ensuring a stable and sustainable power supply for the Sandwell Metropolitan Borough Council (SMBC) area and the national energy market.
Screenshot 2026-05-10 162336.jpg

2026 by Energy Hub Developments Ltd. 

Registered Address: Intergen House, 65-67 Western Road, Hove, East Sussex, United Kingdom  BN3 2JQ 

Company Number: 13028274

bottom of page